On February 15, 2021 during a major power outage that impacted much of the state of Texas, an automatic reactor trip shut South Texas Nuclear Generation Station Unit 1 due to low steam generator levels.
Why did the nuclear plant shut down in Texas?
On June 7, almost a full week before the heatwave, a reactor at the Comanche Peak nuclear plant outside of Dallas dropped offline because of a transformer fire. Although the flames were quickly doused, the reactor is still down, and owner Vistra Corp. hasn’t said when it may return.
Why is South Texas nuclear plant offline?
South Texas Project nuclear plant, STP. … Two of three sensing lines froze because of cold weather, which then caused the reactor to “trip,” or go offline, according to emails from Dricks and Vicki Rowland, Internal Communications lead at STP Nuclear Operating Company.
Why did stp shut down?
The unit, located in Bay City, Texas, was operating at 36% of capacity early the morning of Feb. … Rowland said Feb. 16 the unit shut “due to cold weather-related issues in the plant’s feedwater system.” Weather conditions did not impact the 1,312-MW South Texas Project-2, which operated at 100% early Feb.
What is the newest power plant in Texas?
1.2-GW Dedicated Hydrogen-Fired Power Plant Starts Taking Shape in Texas
- Entergy’s proposed Orange County Advanced Power Station is a 1,215-MW dual-fuel combined cycle power facility that will be fired with hydrogen and natural gas. …
- A view of existing hydrogen (H2) systems in the U.S. Gulf Coast region.
Is South Texas nuclear plant running?
The two planned units do not currently have a planned construction date. On February 15, 2021 during a major power outage that impacted much of the state of Texas, an automatic reactor trip shut South Texas Nuclear Generation Station Unit 1 due to low steam generator levels.
How do you shutdown a nuclear plant?
To shut down a nuclear power plant, the reactor must be brought into a permanently uncritical state (subcriticality) and the heat that continuous to generate must be discharged safely.
Why did Diablo Canyon close?
The plant is located in Nuclear Regulatory Commission Region IV. In 2016, PG&E announced that it plans to close the two Diablo Canyon reactors in 2024 and 2025, stating that because California’s energy regulations give renewables priority over nuclear, the plant would likely only run half-time, making it uneconomical.
Why did Germany stop using nuclear power?
In September 2011, German engineering giant Siemens announced it will withdraw entirely from the nuclear industry, as a response to the Fukushima nuclear disaster in Japan, and said that it would no longer build nuclear power plants anywhere in the world.
Did Comanche Peak shutdown?
The Comanche Peak nuclear power plant near Fort Worth was shut down after a leak of radioactive water, leading to government scrutiny of the utility’s plan for finding such leaks. … They have since repaired leaking and corroded lines, he said.
Are there nuclear power plants in Texas?
There are two operating nuclear power plants in Texas. The South Texas Project (STP) is in Matagorda County near Bay City, about 90 miles southwest of Houston. Comanche Peak Nuclear Power Plant is in Somervell County near Glen Rose, TX, about 40 miles south of Fort Worth.
Who owns STP Nuclear Power Plant?
One of the Comanche Peak nuclear power plant’s two units has been offline for more than a week following a June 7 fire in the main transformer, putting pressure on the Texas power grid and contributing to this week’s plea for statewide conservation.
Who owns the power plant in Texas?
Denver-based BKV is purchasing the 758-megawatt Temple, Texas, facility from closely held Temple Generation I LLC through a 50-50 joint venture with Banpu Power US Corp, a related company. The deal is expected to close in the fourth quarter of 2021.